Browse by Service

  • All Services
  • Civil Engineering
  • Construction Administration
  • Environmental Engineering
  • Geotechnical
  • Industrial
  • Industrial Hygiene
  • Land and Site Development
  • Landscape Architecture
  • Materials Testing
  • Recreation
  • Structural
  • Surveying
  • Transportation
  • Water Systems
  • Wastewater
  • Browse by Location

    • All Locations
      Bozeman
      Great Falls
      Kalispell
      Lewiston
      Media
      Shelby
      Spokane
      Watford City
      • All Services - All Locations
        • Montana State University Yellowstone Hall

          Montana State University Yellowstone Hall

          Bozeman Office

          TD&H Engineering provided a multidiscipline scope of services for the newest 400-bed residence hall on the MSU campus.

           View Project
        • Monforton Middle School

          Monforton Middle School

          Bozeman Office

          Once completed, the new middle school and existing campus structures will be capable of supporting the district’s future needs.

           View Project
        • City of Livingston Engineering Services

          City of Livingston Engineering Services

          Bozeman Office

          TD&H Engineering provides miscellaneous and task-based engineering services as needed for the City of Livingston.

           View Project
        • Downtown Bozeman Streetscape

          Downtown Bozeman Streetscape

          Bozeman Office

          The Bozeman Downtown Streetscape Improvements project is a multi-phase project providing functional and aesthetic enhancements throughout the core area of downtown Bozeman.

           View Project
        • Big Sky Town Center Residential & Commercial Complex

          Big Sky Town Center Residential & Commercial Complex

          Bozeman Office

          The Town Center property is designed to become an incorporated Town in the Meadow Village complex of Big Sky, Montana. TD&H Engineering successfully adapts to fast-changing market conditions affecting engineering design and demonstrates our ability to provide a wide range of services for diverse project needs.

           View Project
        • City of Belgrade Engineering Services

          City of Belgrade Engineering Services

          Bozeman Office

          TD&H Engineering provides on-call engineering services for the City of Belgrade.

           View Project
        • McFarlan Road Board Renovation

          McFarlan Road Board Renovation

          Media Office

          Historic building renovation of abandoned barn in Kennett Square PA to a twin unit dwelling.

           View Project
        • “River Place”

          “River Place”

          Lewiston Office

          A structural engineering masterpiece located on the Potlatch River in Idaho.

           View Project
        • Meadows RV Park

          Meadows RV Park

          Watford City

          TD&H completed boundary and topographic surveying and fieldwork as well as a preliminary and final design of RV park streets, utilities, storm drainage and grading associated with a 30 Unit RV Park, including public bathrooms, showers, and laundry facility.

           View Project
        • Emerald Ridge

          Emerald Ridge

          Watford City

          The Emerald Ridge project consists of over 160 acres of multi-family residential, commercial, office, and retail structures to help accommodate the need for infrastructure in the heart of the Bakken oil field.

           View Project
        • Wolf Run Village & Wolf Pup Daycare

          Wolf Run Village & Wolf Pup Daycare

          Watford City

          Wolf Run Village is a housing development nearing completion in Watford City, North Dakota.

           View Project
        • Lift Station and Manhole Rehabilitation Project

          Lift Station and Manhole Rehabilitation Project

          Spokane Office

          This project was designed to address excessive groundwater infiltration into the Town of Farmington’s sewage collection system and to replace a failing sewage pump station.

           View Project
        • Glenview & Apple Valley Sewer Designs

          Glenview & Apple Valley Sewer Designs

          Spokane Office

          These two projects in the Spokane Valley involved design and plan preparation to install new sewer services in areas previously served only by septic systems.

           View Project
        • North Bank Sewer Replacement

          North Bank Sewer Replacement

          Spokane Office

          This project involved an emergency primary interceptor sewer replacement along Rock Creek and was funded by FEMA. TD&H completed plans and specifications for the removal and replacement of 850 LF of sewer main.

           View Project
        • Wastewater Treatment Facility Improvements

          Wastewater Treatment Facility Improvements

          Spokane Office

          A major upgrade of the Town’s wastewater treatment plant that included installation of an influent metering system, a sewage pumping station, wastewater pond aeration equipment, construction of an ultraviolet disinfection system for effluent discharge, and construction of a 1.3 million gallon lined storage lagoon.

           View Project
        • Five Mile Road Improvements

          Five Mile Road Improvements

          Spokane Office

          This $7 million City of Spokane project involved the widening and repaving of Five Mile Road between Austin and Lincoln Roads.

           View Project
        • Foster Creek Avenue Improvements

          Foster Creek Avenue Improvements

          Spokane Office

          Foster Creek Avenue was a 22’ wide street with narrow shoulders and no pedestrian facilities or on-street parking. Pedestrians used either the roadway or gravel shoulders for walkway. Now, the roadway consists of two 11’ travel lanes, two 5’ bike lanes, curb, gutter and sidewalks.

           View Project
        • Nelson Street Rehabilitation

          Nelson Street Rehabilitation

          Spokane Office

          This project was a full depth curb-to-curb rehabilitation of Nelson Street from Mission Avenue to Marshall Avenue and surrounding residential streets. The project came in on time and under budget.

           View Project
        • Third Street Reconstruction

          Third Street Reconstruction

          Spokane Office

          This project involved the reconstruction of 0.34 miles of Third Street in the Town of Farmington, Washington. Work included demolition, grading, drainage facilities, aggregate and asphalt concrete surfacing, utility adjustments, pavement markings, and concrete curb, gutter and sidewalk.

           View Project
        • Davenport Water Park

          Davenport Water Park

          Spokane Office

          TD&H led the architectural and engineering team that provided design and construction contract administration services to the Lincoln County Parks and Recreation District and the City of Davenport for a new swimming pool facility.

           View Project
        • Speed Slide

          Speed Slide

          Spokane Office

          TD&H prepared a topographic survey and structural calculations for a new water slide. The slide “Fastball” comes equipped with a radar gun at the exit and, according to Splash Down representatives, the sliders speed could reach 30 to 40 mph.

           View Project
        • EWU Washington State Patrol Crime Lab

          EWU Washington State Patrol Crime Lab

          Spokane Office

          TD&H teamed with Integrus Architecture and Sherry Pratt VanVoorhis Landscape Architects to provide the civil design and construction services for this new “state of the art” crime laboratory for the Washington State Patrol’s Eastern Region.

           View Project
        • EWU Student Recreation Center

          EWU Student Recreation Center

          Spokane Office

          TD&H Engineering and GeoEngineers teamed to perform site subsurface explorations and provided recommendations for site preparation, foundation design and stormwater disposal based on subsurface exploration, laboratory testing and engineering analyses.

           View Project
        • Sterling Savings Bank Sidewalk/Drainage Design

          Sterling Savings Bank Sidewalk/Drainage Design

          Spokane Office

          This project was led by 3E Design, who brought TD&H on their team to design the sidewalk and develop a drainage plan for the renovation of this branch of the Sterling Savings Bank in downtown Spokane. TD&H provided design services for the curb, gutter and sidewalk, along with a street drainage plan. The engineers at TD&H also provided liaison services for the client with the engineering staff at the City of Spokane.

           View Project
        • Spokane Falls Community College Music Building Design

          Spokane Falls Community College Music Building Design

          Spokane Office

          The expansion included the lobby and a new addition providing for classrooms, studio and offices to locate all the music classes in one building. This expansion and renovation greatly improves and creates a more functional and efficient building. TD&H Engineering was a subconsultant to Integrus Architecture (Spokane, WA) and provided the topographic surveying and civil engineering design services.

           View Project
        • Riverport Villiage Condominiums Site Design & Drainage Plan

          Riverport Villiage Condominiums Site Design & Drainage Plan

          Spokane Office

          TD&H provided property acquisition services, drainage design and review of the grading design for this beautiful addition to Spokane Valley’s central business area.

           View Project
        • Greenacres Middle School Improvements

          Greenacres Middle School Improvements

          Spokane Office

          A major school renovation and site improvement project led by ALSC Architects for the Greenacres Middle School in Spokane Valley. TD&H was involved as a civil engineering subconsultant to Sherry Pratt Van Voorhis Landscape Architects.

           View Project
        • Downtown Spokane Transit Center & sky Bridge

          Downtown Spokane Transit Center & sky Bridge

          Spokane Office

          TD&H was responsible for securing the aerial easement necessary for construction of the sky bridge. On the ground, TD&H designed the sidewalks, curbing and storm drainage for the facility.

           View Project
        • Digital Archive Facility

          Digital Archive Facility

          Spokane Office

          A modern digital archive facility constructed by the Washington Secretary of State on the campus of Eastern Washington University.

           View Project
        • Avista Utilities Post Street Reactors

          Avista Utilities Post Street Reactors

          Spokane Office

          Thomas, Dean & Hoskins, Inc. (TD&H) provided engineering support services related to the modification of the existing 115 kV transformer housing, so that transformers could be removed through the walls common to each building.

           View Project
        • Avista Utilities Little Falls Dam Headgates Evaluation

          Avista Utilities Little Falls Dam Headgates Evaluation

          Spokane Office

          Thomas, Dean & Hoskins, Inc. (TD&H) evaluated the condition and serviceability of the headgates and associated hoist system and determine the feasibility of rehabilitation or the need for replacement.

           View Project
        • Tucannon Hatchery Fish Ladder and Trap Tucannon River

          Tucannon Hatchery Fish Ladder and Trap Tucannon River

          Spokane Office

          TD&H was retained by the Washington Department of Fish and Wildlife to provide construction oversight and inspection for a new fish ladder on the Tucannon River. The purpose of the new ladder was to improve adult and juvenile wild salmonid migration passage and fish monitoring.

           View Project
        • Sprague Avenue Overlay

          Sprague Avenue Overlay

          Spokane Office

          City of the Spokane Valley selected TD&H to provide construction administration and on-site inspection for the $2.6 million Sprague Avenue Overlay – University Road to Evergreen Road.

           View Project
        • Salmon Creek – Mill Street Bridge Replacement

          Salmon Creek – Mill Street Bridge Replacement

          Spokane Office

          TD&H was hired by the City of Okanogan to provide construction contract administration services. This project involved removing an existing bridge and replacing it with a concrete structure.

           View Project
        • Hauser Refueling Depot

          Hauser Refueling Depot

          Spokane Office

          On site surveillance, coordination and supervision of on-going construction activities; Coordination with geotechnical investigations; Coordination with underground utility locations; Observation of contractor work with regards to safety and quality; On call survey services.

           View Project
        • Moonlight Basin Subdivisions

          Moonlight Basin Subdivisions

          Bozeman Office

          TD&H Engineering provided engineering and surveying services for the Silvertip Subdivision Phases 1 and 2 and Lower Ulery’s Subdivision Phases 1 and 2.

           View Project
        • Montana State University New Residence Hall

          Montana State University New Residence Hall

          Bozeman Office

          TD&H Engineering provided a multidiscipline scope of services for the newest dorm on the MSU campus.

           View Project
        • Water Reservoir and Transmission Mains

          Water Reservoir and Transmission Mains

          Spokane Office

          TD&H designed a 200,000 gallon water storage reservoir, access road, water transmission mains, booster pump upgrade for the Veranda Beach Resort north of Oroville, Washington, on Lake Osoyoos.

           View Project
        • Municipal Water Tank #10

          Municipal Water Tank #10

          Spokane Office

          TD&H provided design and limited construction engineering services for a City of Pullman project to construct a new 1.2 million gallon steel water storage reservoir in the southwest quadrant of the City.

           View Project
        • Water System Treatment Facility

          Water System Treatment Facility

          The Town of Ione’s water source wells contain significant amounts of iron and manganese that, over a period of time, has accumulated in the lesser velocity piping throughout the town. Over time, this sediment caused the steel piping to corrode and rupture. The water distribution system has been replaced under separate contracts.

           View Project
        • Municipal Water Distribution System Improvements

          Municipal Water Distribution System Improvements

          Spokane Office

          TD&H assisted the community of Ione designing and administering a major pipeline replacement project for the Town’s municipal water system.

           View Project
        • 10th Street Water Main

          10th Street Water Main

          Spokane Office

          Over a 10-year period, TD&H assisted the Town of Ione with applications for funding of upgrades and improvements to replace the town’s water distribution and treatment system.

           View Project
        • Central Energy Plant

          Central Energy Plant

          Lewiston Office

          St. Joseph Regional Medical Center recently completed a $15 Million project to construct a new central energy plant to provide power and other utilities to the entire campus.

           View Project
        • Proposed Bozeman Sports Complex

          Proposed Bozeman Sports Complex

          Bozeman Office

          TD&H provided concept-level cost estimation, geotechnical investigation, & soil suitability analysis for this proposed 80-acre sports complex.

           View Project
        • Yellowstone National Park Dormitories

          Yellowstone National Park Dormitories

          Bozeman Office

          This ongoing project has had many innovative designs and we are looking forward to the upcoming construction next to Old Faithful in Yellowstone National Park.

           View Project
        • MSU- Harrison Street Reconstruction

          MSU- Harrison Street Reconstruction

          Bozeman Office

          TD&H provided civil site design to improve traffic flow and circulation around the campus of Montana State University.

           View Project
        • MSU- South Fieldhouse Parking Lot Improvements

          MSU- South Fieldhouse Parking Lot Improvements

          Bozeman Office

          This large parking lot was originally designed as a gravel surface but by paving and painting the surface TD&H helped MSU solve many parking issues.

           View Project
        • MSU- Residence Halls

          MSU- Residence Halls

          Bozeman Office

          TD&H provided geotechnical support of this $7M project. The data collected by soil sampling aided with important construction decisions, that ensure the project has no surprises.

           View Project
        • Super 1 Foods Store

          Super 1 Foods Store

          Kalispell Office

          TD&H provided site/civil design services for the parking lot renovation.

           View Project
        • Jette Meadows Water & Sewer District

          Jette Meadows Water & Sewer District

          Kalispell Office

          Using funding from state and federal grants and low interest loans from the Montana DEQ Drinking Water State Revolving Loan Program, Jette Meadows was able to replace over 13,200 LF of existing distribution mains.

           View Project
        • CSKT Street Renovation Projects

          CSKT Street Renovation Projects

          Kalispell Office

          TD&H provided surveying and engineering design services for the reconstruction of over 6,000 LF of existing subdivision infrastructure and the new construction of approximately 1.5 miles of multi use path. The overall project consisted of five separate projects.

           View Project
        • Birch Point & City Beach Sewer Lift Stations

          Birch Point & City Beach Sewer Lift Stations

          Kalispell Office

          Design services for the replacement of an existing sewage pump station located adjacent to the Whitefish River.

           View Project
        • Seeley Lake Water Project

          Seeley Lake Water Project

          Kalispell Office

          Complete design of the District’s water improvements.

           View Project
        • Skye Park Bridge

          Skye Park Bridge

          Kalispell Office

          The Skye Park Bridge and path project over the Whitefish River.

           View Project
        • Fire Station No. 3 Remodel

          Fire Station No. 3 Remodel

          Spokane Office

          TD&H Engineering was hired by Chris Morlan Architects as a subconsultant to perform structural design tasks for the remodel of Fire Station No. 3. The remodeling included an one-story CMU addition tied into existing structure, and a 6-ton crane beam design.

           View Project
        • N. Idaho Residence

          N. Idaho Residence

          Spokane Office

          Overlooking one of Northern Idaho’s most beautiful lakes and set on top of a very steep hillside site this beautiful five-story residence with driveways on the upper and lower ends, an elevator, large open windows and large cantilevered decks. TD&H performed both structural and civil design for this structure which involved multiple steel beams, steel frames, retaining walls, and site specific design. This project was designed by Don Henrichs with Design Alliance.

           View Project
        • G Student Housing

          G Student Housing

          Spokane Office

          TD&H consulted with RnD Architects to best develop a modern looking apartment building to serve the students at Gonzaga University. This unique entryway has been framed with steel in the shape of a “G” and the main floor has a large spacious area with a Kitchen, media pit, and open areas.

           View Project
        • Spill Channel Re-Design

          Spill Channel Re-Design

          Spokane Office

          TD&H provided topographic surveying of the channel, geotechnical engineering, civil engineering, structural engineering, construction administration, and construction inspection for eight concrete weirs anchored in the Spokane River channel.

           View Project
        • Indian Creek Railroad Trestle Landslides

          Indian Creek Railroad Trestle Landslides

          Great Falls Office

          This project consists of a steel railroad trestle (early 1900’s) approximately 1300 feet long and 160 feet high. Both approach abutments were constructed on existing landslides.

           View Project
        • Culdesac Water System

          Culdesac Water System

          Lewiston Office

          Phase I (water distribution) of a two-phase project to improve citywide water distribution and wastewater treatment. Design, survey, construction management and construction staking of water systems improvements including the installation of two metering buildings and water treatment equipment, upgrading existing wells, and installation of new service loops, larger distribution mains, and replacement of services

           View Project
        • Water System Improvements

          Water System Improvements

          Lewiston Office

          Design, survey, construction management and construction staking of citywide water systems improvements including the installation of two new wells situated to allow them to draw on a different aquifer than the city’s current wells, a new pump house, new transmission mains to link the new wells to the city’s existing storage tanks, installation of new service loops, larger distribution mains, and replacement of services.

           View Project
        • Water Main Extension/Upgrade

          Water Main Extension/Upgrade

          Lewiston Office

          This project involved approximately 3,500 L.F. of new 8” waterline for the City of Asotin, including hydrant installation and inter-tie with Asotin County PUD.

           View Project
        • Potlatch No. 1 FCU Building

          Potlatch No. 1 FCU Building

          Lewiston Office

          TD&H provided field surveying, topographical surveying and civil design site plans and specifications for two building sites which are located in Clarkston, WA and Grangeville, ID.

           View Project
        • 4th St. Parking Project

          4th St. Parking Project

          Lewiston Office

          TD&H worked Phase I with design and construction of additional parking lots for Lewis-Clark State College and Phase II involved construction to coordinate stormwater improvements with the City of Lewiston.

           View Project
        • Staybridge Suites

          Staybridge Suites

          Great Falls Office

          TD&H performed Phase I and Phase II site assessment work for the Brownfields project, including hazardous building materials assessments for the structures formerly on the site

           View Project
        • Federal Courthouse

          Federal Courthouse

          Great Falls Office

          TD&H performed construction materials testing for a $20 million new federal courthouse in Great Falls, Montana.

           View Project
        • Industrial Park

          Industrial Park

          Great Falls Office

          TD&H has provided engineering support to Montana Specialty Mills for their planned move to a new industrial park property.

           View Project
        • Grain Load Facilities

          Grain Load Facilities

          Great Falls Office

          TD&H Engineering completed civil engineering and construction management/inspection services for three high-speed grain elevator facilities in north central Montana

           View Project
        • Copper Basin Subdivision

          Copper Basin Subdivision

          Great Falls Office

          TD&H is currently working with NeighborWorks, a local non-profit organization, on a 22 lot subdivision in Black Eagle, MT.

           View Project
        • Grandview at Benefis

          Grandview at Benefis

          Great Falls Office

          TD&H is responsible for planning, rezoning, development, civil engineering designs, cost estimating, environmental reports and agency coordination.

           View Project
        • Ulm South Reconstruction

          Ulm South Reconstruction

          Great Falls Office

          TD&H provided complete project design that included complex wetland and geotechnical issues for Cascade County and the Montana Department of Transportation.

           View Project
        • Office Building/Parking Garage

          Office Building/Parking Garage

          Lewiston Office

          TD&H provided services for Regence BlueShield of Idaho Lewiston Campus Expansion including construction of a new 3 story, 50,000 square foot, office building and a 5-Story parking garage for their employees which included a Fitness Center on top of the structure.

           View Project
        • Container Dock Crane Foundation

          Container Dock Crane Foundation

          Lewiston Office

          The Port of Lewiston retained TD&H to provide engineering assistance with improvements to one of it’s barge loading and unloading facilities to accommodate a new 240- ton crawler crane.

           View Project
        • South of Ravalli to Medicine Tree

          South of Ravalli to Medicine Tree

          Great Falls Office

          TD&H provided comprehensive road design as well as surveying & retaining wall design for a 5 mile segment of US Highway 93.

           View Project
        • Special Improvement District

          Special Improvement District

          Bozeman Office

          TD&H was responsible for creating this special improvement district (SID) with the landowners and the City of Bozeman engineering staff.

           View Project
        • S. 19th-Babcock to Kagy

          S. 19th-Babcock to Kagy

          Bozeman Office

          TD&H widened 1.4 miles of existing arterial street to four lanes with dedicated left turn lanes, bike lanes, and sidewalks in this Transportation project.

           View Project
        • Rails to Trails

          Rails to Trails

          Kalispell Office

          TD&H provided design plans, specifications and construction management for this project that included a 4,000-foot long trail and a small parking lot.

           View Project
        • Bike/Pedestrian Path

          Bike/Pedestrian Path

          Great Falls Office

          This important extension to Rivers Edge Trial incorporates many challenges including highway and railroad underpasses adjacent to the Missouri River.

           View Project
        • Riverside Railyard Skatepark

          Riverside Railyard Skatepark

          Great Falls Office

          TD&H provided site and structural design for a 45,000 sq.ft concrete skatepark located in Great Falls.

           View Project
        • Electric City Soccer Complex

          Electric City Soccer Complex

          Great Falls Office

          This project consisted of the layout, design and construction administration for 10 soccer fields with 5 additional field greens on a 65 acre site.

           View Project
        • Flow Rider Attraction

          Flow Rider Attraction

          Great Falls Office

          TD&H was contacted by Wave Loch Tool and Die of LaJolla, California to aid in the development of the Flow Rider attraction at the Mitchell Pool.

           View Project
        • MSAT Project

          MSAT Project

          Great Falls Office

          TD&H provided a wide array of Civil and Structural Engineering Services for the Mobile Source Air Toxins (MSAT) Project.

           View Project
        • Petrochemical Facility

          Petrochemical Facility

          Great Falls Office

          TD&H Engineering has provided design and construction support of several expansion projects at Montana Refining Company’s Petrochemical Facility.

           View Project
        • Oilfield Avenue Path

          Oilfield Avenue Path

          Great Falls Office

          This project developed bike lanes and a separated trail that extended the Lake Shel-Oolee Recreation Trail one mile along a busy arterial in Shelby. The project construction was ultimately merged with a parallel MDT highway project.

           View Project
        • Agri-Processing Facilities

          Agri-Processing Facilities

          Great Falls Office

          TD&H Engineering completed civil engineering and construction management/inspection services for three high-speed grain elevator facilities in north central Montana.

           View Project
        • Community Water Project

          Community Water Project

          Great Falls Office

          The Blackfeet Tribe created the Blackfeet Community Water Project to provide safe potable water to the communities of East Glacier and Browning. Water is withdrawn through an intake screen located in the bottom of Lower Two Medicine Lake approximately 1,500 feet from shore.

           View Project
        • Wastewater System Improvements

          Wastewater System Improvements

          Great Falls Office

          TD&H designed and provided construction oversight for an entirely new sanitary sewer collection treatment system for the community of Brady.

           View Project
        • GF Central Catholic HS

          GF Central Catholic HS

          Great Falls Office

          TD&H provided the structural design for the foundation, mezzanine and partial building design as well as the site design and surveying for the 38,400 SF High School.

           View Project
        • US 93 Road Design

          US 93 Road Design

          Great Falls Office

          TD&H provided comprehensive road design as well as surveying & retaining wall design for a 5 mile segment of US Highway 93.

           View Project
        • Steel, Etc.

          Steel, Etc.

          Great Falls Office

          This project involved the design of 2,760 feet of rail spur to service the new recycling center complex.

           View Project
        • Gas to Energy

          Gas to Energy

          Kalispell Office

          Flathead Electric Cooperative and the Flathead County Solid Waste District teamed together to build this alternative energy facility at the Flathead County Landfill.

           View Project
        • Hungry Horse Water System Improvements

          Hungry Horse Water System Improvements

          Kalispell Office

          TD&H completed a Preliminary Engineering Report for the District to address limited water storage, well capacity, and lack of fire protection. The project will rehabilitate an existing well and construct a storage tank adjacent to the existing storage tank.

           View Project
        • Meadow Village Well

          Meadow Village Well

          Bozeman Office

          TD&H engineered the connection of two new wells to the water system for the Big Sky Water and Sewer District #363. The project began with a topographic survey, hydraulic analysis, and a review of the controls and backup power options.

           View Project
        • S. 19th –Babcock to Kagy

          S. 19th –Babcock to Kagy

          Bozeman Office

          This project involves widening 1.4 miles of existing arterial street to four lanes with dedicated left turn lanes, bike lanes, and sidewalks. TD&H has provided survey, geotechnical investigation, road, storm drain, signing, and striping design, and preparation of plans, specifications, and cost estimates.

           View Project
        • BNSF Drainage Project

          BNSF Drainage Project

          Bozeman Office

          TD&H was engaged to improve the drainage at the BNSF Billings Intermodal Hub. This 11 acre site is used to transfer cargo units from train transport to truck transport.

           View Project
        • Whitehall HS Reroof

          Whitehall HS Reroof

          Bozeman Office

          TD&H Engineering applied to the Montana Quality Schools program on behalf of Whitehall High School District. The project was awarded a planning grant for a Preliminary Engineering Report and a construction grant for the full cost of replacing their aged and failing roof.

           View Project
        • Irrigation Pond Expansion

          Irrigation Pond Expansion

          Bozeman Office

          The growing campus of Montana State University in Bozeman needed more water for irrigation The old 4.5 million gallon bentonite lined pond and intake structure were built around 1986.

           View Project
        • Barretts Minerals Regal Mine

          Barretts Minerals Regal Mine

          Bozeman Office

          TD&H helped Barretts Minerals by designing a new shop building at their Regal talc mine. Our services included performing a geotechnical investigation on a tailings pile, where the new shop was to be located.

           View Project
        • Meadow Village Well Completion

          Meadow Village Well Completion

          Bozeman Office

          TD&H engineered the connection of two new wells to the water system for the Big Sky Water and Sewer District #363. The project began with a topographic survey, hydraulic analysis, and a review of the controls and backup power options.

           View Project
        • Chemistry Building

          Chemistry Building

          Great Falls Office

          The chemistry building is a state of the art research facility and multiple labs to the students. TD&H completed the structural design, drafting and construction support for this 5-level, 66,500 SF building

           View Project
        • Orthopedic Center

          Orthopedic Center

          Great Falls Office

          The new fully functional orthopedics facility is a 58,000 SF two-story building with offices, operating rooms, patient recovery rooms, exam rooms, basketball shooting area and other miscellaneous rooms.

           View Project
        • Powwow War Dance Pavilion

          Powwow War Dance Pavilion

          Great Falls Office

          TD&H has been instrumental in the Powwow Dance Pavilions. In 1993 TD&H provided the structural design for the 130’ Dance Pavilion. With the new plan, this structure will be used for stick games in the summer of 2009 when another pavilion is constructed on the grounds.

           View Project
        • Browning High School

          Browning High School

          Great Falls Office

          The new Browning High School is a 130,000 square foot CMU and steel stud frame building constructed for 750 students in Browning, Montana. TD&H was the principal consultant during the conceptual stage through design, bidding, and construction.

           View Project
        • Benefis Patient Tower

          Benefis Patient Tower

          Great Falls Office

          TD&H provided the structural design for the 175,000 SF, 6-story building with a 7th story mechanical penthouse. Structural system is a concrete moment frame on a drilled shaft foundation.

           View Project
        • Water Tank Construction

          Water Tank Construction

          Bozeman Office

          Belgrade has experienced rapid growth resulting in a heavily overloaded water system. The addition of 112 acres of land being annexed in SID 78 on the south side of the interstate and two large subdivisions on the east side of town required the construction of a new 500,000 gallon water tank.

           View Project
        • Bay Drive Recreation Path

          Bay Drive Recreation Path

          Great Falls Office

          This important extension to Rivers Edge Trial incorporates many challenges including highway and railroad underpasses adjacent to the Missouri River. Complex easement and permitting issues were solved to allow the design and planned construction of this trail segment.

           View Project
        • Whitefish Trails

          Whitefish Trails

          Kalispell Office

          The Whitefish Trails projects consisted of preliminary and final design, construction management and inspection of six pedestrian and bicycle trails. TD&H provided assistance with procurement of CTEP funds and right-of-way negotiations.

           View Project