Browning High School


Construction Costs: $21,000,000
Completion Date: 2009


Project Description

The new Browning High School is a 130,000 square foot CMU and steel stud frame building constructed for 750 students in Browning, Montana. TD&H Engineering was the principal consultant during the conceptual stage through design, bidding, and construction. TD&H Engineering performed the geotechnical investigation and topographic survey of the entire 310-acre site, structural design for the foundation and unique wall system, designed the water and sewer system which tied into the City’s systems, created on-site storm water detention, and completed design of the access roads and parking. Included in the site design was a turn lane on Montana Highway 89 with a new approach to the high school.  During construction, TD&H Engineering provided construction administration and inspection oversight including shop drawing review, periodic site inspections, change order creation, pay request review, answering RFI’s and final inspections.

Share:    Share on Facebook Share on Twitter

Services

  • Civil Engineering
  • Construction Administration
  • Geotechnical
  • Structural
  • Surveying