Alternative Energy Facility



Project Description

Flathead Electric Cooperative and the Flathead County Solid Waste District teamed together to build this alternative energy facility at the Flathead County Landfill.  The facility will initially generate enough electricity to serve up to 900 households and will eventually grow to serve approximately 1600.  TD&H Engineering worked with SCS Energy to engineer the facility.  TD&H Engineering provided civil/site engineering including storm drainage design, utility plans, structural and foundation design, construction administration and inspection, and materials testing.

Share:    Share on Facebook Share on Twitter

Services

  • Civil Engineering
  • Construction Administration
  • Industrial
  • Materials Testing
  • Structural