Brady Wastewater System Improvements



Project Description

TD&H Engineering designed and provided construction administration for an entirely new sanitary sewer collection treatment system for the community of Brady. The wastewater improvements included lagoon reconfiguration and lining as well as the addition of solar powered irrigation system designed for disposal of the treated effluent. A small concrete pump house adjacent to the lagoons houses the controls for the two PV-direct solar pumps. Two solar panel arrays provide enough power to irrigate the alfalfa fields surrounding the lagoons.

Share:    Share on Facebook Share on Twitter

Services

  • Construction Administration
  • Wastewater Systems