This project provided a major upgrade to the Town’s wastewater treatment plant including the installation of an influent metering system, a sewage pumping station, wastewater pond aeration equipment, construction of an ultraviolet disinfection system for effluent discharge, and construction of a 1.3 million-gallon lined storage lagoon.