Whitehall HS Reroof


Client Name: Whitehall High School District


Project Description

TD&H Engineering applied to the Montana Quality Schools program on behalf of Whitehall High School District. The project was awarded a planning grant for a Preliminary Engineering Report and a construction grant for the full cost of replacing their aged and failing roof. The new SBS Modified Roof System includes 4 inches of new foam insulation, which increased the rating from R-15 to R-35. The energy savings from this project are expected to drastically reduce the District’s operating costs over the life of the building.

Share:    Share on Facebook Share on Twitter

Services

  • Structural Engineering