Foster Creek Avenue Improvements

Foster Creek Avenue was previously a 22′ wide street with narrow shoulders and no pedestrian facilities or on-street parking. TD&H provided improvements to the roadway, consisting of two 11’ travel lanes, two 5’ bike lanes, curb, gutter, and sidewalks. The outer 6’ of roadway on the non-sidewalk side and 11’ on the sidewalk side were widened to accommodate the improvements. After widening, a 2” HMA overlay was applied throughout the project lines.

Job Site Location

Spokane, WA