Project Highlight: Stites Water System Improvements
The City of Stites is currently in construction of water system improvements, which includes a 174,000 gallon, 30-foot diameter, 34-foot tall prefabricated bolted steel plate fusion bond coated steel tank to be erected onsite. The remaining improvements for the project include replacement of 7,000 LF of water main, replacement of 119 water meters, installation of 13 additional meters, replacement of 11 various sized hydrants with 6-inch hydrants, reconnection of three existing 6-inch hydrants to the new water main, and installation of an additional seven new 6-inch hydrants. TD&H procured funding for the project and completed the planning, surveying, environmental engineering, design for the project and is currently providing construction management, inspection, and funding administration for the project