TD&H worked with the City of Spokane to widen and repave Five Mile Road between Austin and Lincoln Roads. The project included the addition of curbs, sidewalks, and bike lanes as well as the installation of trees, sewer and water lines, and grassy swales. A center turn lane was added between Stratton Avenue and Lincoln, and a second lane was added between Austin and Albert Court to accommodate slower-moving vehicles on the uphill ascent. TD&H designed the structure layout, pavement vertical locations, curb and gutter locations, and retaining wall vertical location as well as control point, centerline, right-of-way, slope, construction staking, supplemental control, and as-built surveying.
Job Site Location
Spokane, WA