Pomeroy 6th Street Bridge

The existing bridge was structurally deficient and an increasing concern for its structural capacity to carry load. The existing bridge was considered functionally obsolete due to width. TD&H procured funding for the project, completed the environmental permitting, surveying, and design and is in the process of bidding the project. TD&H provided construction management and funding administration services. The project consisted of replacing the existing single span bridge with a prestressed concrete girder structure that was longer and wide enough to provide continuous sidewalk on both sides consistent with roadway approaches on each end.