Sunnyside Reservoir, Pump Station & Waterline Relocation and Replacement

The Sunnyside service area consists of over 50 residences served by a single water tank within a separate water pressure zone. The old concrete tank, built in the 1940’s, leaked for years and was a top priority for replacement. The project was completed with a 100% grant and included a new 55-gallon storage reservoir, yard piping, and tie-in to the existing system as well as a new telemetry system.